ASHEVILLE CITY SCHOOLS
LEARN | DISCOVER | tHRIVE
Potential Middle School Reconfiguration Information
Version 1.3
The Charge
Initial Analysis & Solutions Under Consideration
Deeper Capacity Analysis
*Capacity value is based on the DPI Standard as reported in the most recent facility study completed on each facility. New capacity study is underway and updated numbers will be shared as soon as the study is completed.
**AHS/SILSA DPI number is 1,935, but historically the core student value has been used for capacity for this site.
Identify Tenable Options for Immediate Action
Options Unders Consideration
No change
No decision has been made. The Board is exploring options, including the pros and cons to keep the current configuration.
Move MNSA to another site
Examine the pros and cons to moving MNSA to share space in another ACS facility
Transition from 2 middle schools to 1
Examine the pros and cons of combining the unique gifts, talents, and strengths of both schools on a single campus.
Advantages & Hardships - No Change
Advantages
Hardships
Advantages & Hardships - Move MNSA to another site (AMS)
Advantages
Hardships
Advantages & Hardships - Move MNSA to another site (ES School for K-8)
Advantages
Hardships
Advantages & Hardships - Transition from 2 MSs to 1 MS
Advantages
Hardships
Quantitative and Qualitative Data
Communitiy Input Presentation
Communitiy Input Gathered
Approx 200
stakeholders attended the community input meeting on Jan 18
531
Stakeholder Comments were collected
118
Stakeholders shared initial preference on options
Summary of Feedback from Community Input Meeting
Summary of Feedback from Community Input Meeting
Citations:
[1] https://ppl-ai-file-upload.s3.amazonaws.com/web/direct-files/9528464/acdff94c-4422-4dd6-8f80-8b6ab2801298/Community Feedback - Qualitative Feedback.pdf
Enrollment Projections
Enrollment Projections
The following two slides provide initial enrollment projections provided to ACS from Cooperative Strategies.
Enrollment projections are built from examination of historical enrollment data, analysis of census data, live birth rates, and cohort survival ratios. The report provides four projections for consideration: high, moderate, low, and a recommended projection. One the study is finalized, the full report will be available for public review.
Enrollment Projections
2023-2024 Out of District Applications: 86% Accepted
Grade | Applications | Denials |
K | 43 | 0 |
1 | 4 | 0 |
2 | 9 | 2 * ^ |
3 | 6 | 0 |
4 | 9 | 2 ^ + |
5 | 7 | 2 ^ + |
6 | 12 | 2 ^^ |
Grade | Applications | Denials |
7 | 7 | 2 ^^ |
8 | 15 | 2 ^ + |
9 | 47 | 5 ^^*** |
10 | 16 | 3 *^^ |
11 | 15 | 3 **^ |
12 | 6 | 5 ^^^^+ |
Total | 212 | 28 |
Denial Codes: Space / Capacity = * Not in Good Standing = ^ Resources = +
Historical MS Enrollment
Historical MS Withdrawals
Between MNSA and AMS Transfers
School Year | MNSA to AMS | AMS to MNSA |
2023-2024 | 6 | 12 |
2022-2023 | 4 | 9 |
Student to Teacher Ratios
Central Office Ratios
CO: 65.08
Maintenance: 97.63
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Student Achievement Data
Potential Savings in Staffing for Option 3
Estimated Potential Reduction of 18 positions*
Estimated Potential Savings between $1.5 and $2Million
*reduction of positions realized through attrition
Potential Savings for Options 2 and 3
Option 2:
Transportation: $130,660
Leases: $90,345
School Nutrition: $90,000
Total: $311,005
Option 3:
Transportation: $130,660
Leases: $90,345
School Nutrition: $90,000
Staffing: $1.5 - $2.0 Million
Total: $1.8 - $2.3 Million
Middle School Timeline
Feb 12th
Initial Study Presentation
Feb 19th 5pm
Public Hearing
Feb 27th 5pm
Public Hearing
March 4th
Updated Study Presented to BOE
March 11
Final Study Presented and Board Vote
Stay Informed
As updates and information are available, please follow ACS on social media and review our web page for new and updated information.
Share your thoughts
Submit Written Feedback to the Board
Email written feedback to the Board via the email address below.
All files and data sources can be found by clicking the link above for the Exhibits linked for this study.
Version 1.1 Updates
Page | Update | Rational |
Initial Analysis & Solutions Under Consideration | removed anticipated 2% supplement increase text | On Feb 12th the Board approved a 2% increase to local supplement so anticipated impact was no longer needed |
Deeper Capacity Analysis | Linked most recent facility capacity information available; added Central Office to the list of facilities | Ensure transparency in reporting and provide direct links to information |
Identify Tenable Options for Immediate Action | Updated Number 3 with info about central office staffing allocations | Clarification that central office staffing will also be adjusted based on enrollment |
Version 1.2 Updates
Page | Update | Rational |
Identify Tenable Options | Added details to items number 3. | |
Version 1.3 Updates
Page | Update | Rational |
MNSA Capacity | Capacity updated to 443 | The data for the above table comes from the NC DPI School Capacity Worksheet. The download for this document can be found on the NCDPI website under Districts & Schools >District Operations > School Planning > Project Planning > Facility Programming. The worksheet from DPI provides data based on “Optimal Capacity.” From the DPI website “Optimal Capacity is defined as, “the most efficient use of space and personnel at a reasonable cost per student.” Maximum Capacity would be schools running at the full enrollment level which may or may not exceed optimal capacity. From a Fire and Life Safety standpoint, Occupancy Load depends on the overall square footage. For areas not in excess of 10,000 sq ft, the occupant load shall not exceed one person in 5 sq ft. For structures in excess of 10,000, the occupant load shall not exceed one person in 7 sq ft. This is per NFPA 101: Life Safety Code as well as NFPA 5000: Building Code. However, per the Asheville Fire Marshal’s office occupancy ratings for schools are only posted for areas of assembly like auditoriums and gymnasiums, not the overall building. ****Montford North Star’s available classrooms were incorrectly listed as 19 in the original memo sent on February 9th. MNSA has 17 classrooms which accounts for the change in DPI Capacity in this memo. |